What has changed: Greenlands, Tattenhall, Cheshire West and Chester
New sales and energy certificates on Greenlands, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Roadworks Street works permit: United Utilities Water Ltd: Utility repair and maintenance works, 17 October 2026 to 23 October 2026 (give and take)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.