What has changed: Arrowe Park Road, Birkenhead, Wirral
New sales and energy certificates on Arrowe Park Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- School inspections Upton Hall School FCJ (secondary, CH49 6LJ): new Ofsted outcome, Report card; previously Outstanding (inspected 29 September 2026)
- Flood risk Flood risk figures for CH49 5PB changed: 0 addresses at high risk, 0 medium, 4 low (was 0, 0, 5)
- Flood risk Flood risk figures for CH49 5LY changed: 1 address at high risk, 0 medium, 1 low (was 1, 1, 2)
- Flood risk Flood risk figures for CH49 5LP changed: 1 address at high risk, 0 medium, 4 low (was 0, 0, 3)
- Flood risk Flood risk figures for CH49 0WF changed: 1 address at high risk, 2 medium, 1 low (was 2, 1, 0)
- Roadworks Street works permit: WIRRAL BOROUGH COUNCIL: Highway improvement works, 9 November 2026 to 31 March 2027 (road closure)
- Roadworks Street works permit: WIRRAL BOROUGH COUNCIL: Highway improvement works, 9 November 2026 to 31 March 2027 (road closure)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.