What has changed: Beverley Way, New Malden, Kingston upon Thames
New sales and energy certificates on Beverley Way, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for SW20 0AW changed: 17 addresses at high risk, 0 medium, 18 low (was 16, 0, 14)
- Flood risk Flood risk figures for SW20 0AQ changed: 0 addresses at high risk, 1 medium, 39 low (was 0, 1, 38)
- Flood risk Flood risk figures for SW20 0AG changed: 1 address at high risk, 2 medium, 25 low (was 0, 13, 9)
- Flood risk Flood risk figures for KT3 4LG changed: 0 addresses at high risk, 0 medium, 23 low (was 0, 6, 11)
- Roadworks Street works permit: TRANSPORT FOR LONDON (TFL): Highway repair and maintenance works, 19 April 2027 to 22 April 2027 (lane closure)
- Roadworks Street works permit: TRANSPORT FOR LONDON (TFL): Highway repair and maintenance works, 22 April 2027 to 23 April 2027 (lane closure)
- Roadworks Street works permit: TRANSPORT FOR LONDON (TFL): Highway repair and maintenance works, 23 April 2027 to 27 April 2027 (lane closure)
- Roadworks Street works permit: TRANSPORT FOR LONDON (TFL): Highway improvement works, 23 October 2026 to 24 October 2026 (lane closure)
- Roadworks Street works permit: TRANSPORT FOR LONDON (TFL): Highway improvement works, 20 October 2026 to 21 October 2026 (lane closure)
- Roadworks Street works permit: TRANSPORT FOR LONDON (TFL): Highway improvement works, 9 October 2026 to 10 October 2026 (lane closure)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.