What has changed: Blackwall Lane, London, Greenwich
New sales and energy certificates on Blackwall Lane, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Food hygiene ratings Nespresso (other catering premises, SE10 0QJ) newly listed: Awaiting inspection
- Flood risk Flood risk figures for SE10 9AN changed: 4 addresses at high risk, 3 medium, 1 low (was 4, 1, 3)
- Flood risk Flood risk figures for SE10 0PL changed: 0 addresses at high risk, 2 medium, 13 low (was 1, 1, 12)
- Flood risk Flood risk figures for SE10 0EZ changed: 0 addresses at high risk, 6 medium, 6 low (was 0, 9, 3)
- Flood risk Flood risk figures for SE10 0EY changed: 0 addresses at high risk, 4 medium, 10 low (was 0, 0, 10)
- Food hygiene ratings St Mary Magdalene School (school/college/university, SE10 0NF) now 4 Good, was Awaiting inspection (rated 29 September 2026)
- Roadworks Street works permit: SOUTHERN GAS NETWORKS PLC: Utility repair and maintenance works, 12 October 2026 to 19 October 2026 (lane closure)
- Roadworks Street works permit: THAMES WATER: Utility asset works, 2 November 2026 to 6 November 2026 (multi-way signals)
- Roadworks Street works permit: THAMES WATER: Utility asset works, 5 February 2027 to 7 April 2027 (multi-way signals)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 3 November 2026 to 5 November 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 13 October 2026 to 15 October 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 13 October 2026 to 15 October 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 26 October 2026 to 28 October 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 13 October 2026 to 15 October 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 13 October 2026 to 15 October 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 27 October 2026 to 29 October 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 12 October 2026 to 14 October 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 27 October 2026 to 29 October 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 12 October 2026 to 14 October 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 27 October 2026 to 29 October 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 12 October 2026 to 14 October 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 27 October 2026 to 29 October 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 12 October 2026 to 14 October 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 2 November 2026 to 4 November 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF GREENWICH: Highway repair and maintenance works, 23 October 2026 to 27 October 2026 (no carriageway incursion)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.