What has changed: Blagdon Road, New Malden, Kingston upon Thames
New sales and energy certificates on Blagdon Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Food hygiene ratings Haru (restaurant/cafe/canteen, KT3 4EZ) now 2 Improvement necessary, was Awaiting inspection (rated 2 November 2026)
- Food hygiene ratings Acorns After School Club Juniors (school/college/university, KT3 4LT) is no longer listed; it was rated 5 Very good
- Food hygiene ratings Nourish Contract Catering LTD @ Burlington School (school/college/university, KT3 4LT) re-inspected, still 5 Very good (rated 5 November 2026)
- School inspections West Wimbledon Primary School (primary, SW20 0BZ): new Ofsted outcome, Report card; previously Good (inspected 22 September 2026)
- Flood risk Flood risk figures for KT3 4BP changed: 0 addresses at high risk, 0 medium, 8 low (was 0, 1, 2)
- Flood risk Flood risk figures for KT3 4AW changed: 0 addresses at high risk, 0 medium, 5 low (was 0, 0, 6)
- Flood risk Flood risk figures for KT3 4AR changed: 0 addresses at high risk, 0 medium, 1 low (was 0, 0, 3)
- Flood risk Flood risk figures for KT3 4AN changed: 0 addresses at high risk, 2 medium, 0 low (was 0, 3, 0)
- Flood risk Flood risk figures for KT3 4AL changed: 0 addresses at high risk, 2 medium, 5 low (was 3, 2, 5)
- Flood risk Flood risk figures for KT3 4AE changed: 1 address at high risk, 2 medium, 14 low (was 2, 3, 14)
- Food hygiene ratings Tree Stone Butchers (retailers - other, KT3 4BT) now 2 Improvement necessary, was Unknown (rated 6 October 2026)
- Food hygiene ratings SCJ Bibimbap And Chimack (restaurant/cafe/canteen, KT3 4ES) now Unknown, was 5 Very good (rated 13 October 2026)
- Roadworks Street works permit: THAMES WATER: Utility repair and maintenance works, 29 October 2026 to 2 November 2026 (no carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF KINGSTON UPON THAMES: Highway improvement works, 2 November 2026 to 13 November 2026 (some carriageway incursion)
- Roadworks Street works permit: ROYAL BOROUGH OF KINGSTON UPON THAMES: Highway repair and maintenance works, 22 October 2026 to 26 October 2026 (no carriageway incursion)
- Energy certificates New energy certificate: band D, house, mid-terrace (lodged 27 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.