What has changed: Boston Road, London, Ealing
New sales and energy certificates on Boston Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for W7 3TR changed: 0 addresses at high risk, 7 medium, 8 low (was 0, 7, 7)
- Flood risk Flood risk figures for W7 3SJ changed: 0 addresses at high risk, 0 medium, 4 low (was 0, 0, 6)
- Flood risk Flood risk figures for W7 3SH changed: 0 addresses at high risk, 1 medium, 2 low (was 0, 1, 5)
- Flood risk Flood risk figures for W7 3QJ changed: 7 addresses at high risk, 0 medium, 2 low (was 7, 0, 0)
- Flood risk Flood risk figures for W7 2AA changed: 0 addresses at high risk, 0 medium, 10 low (was 0, 0, 11)
- Roadworks Street works permit: TRANSPORT FOR LONDON (TFL): Works for road purposes, 9 November 2026 (two-way signals)
- Roadworks Street works permit: LONDON BOROUGH OF EALING: Remedial works, 12 October 2026 to 14 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF EALING: Highway improvement works, 14 October 2026 to 13 November 2026 (no carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF EALING: Highway improvement works, 14 October 2026 to 13 November 2026 (no carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF EALING: Highway improvement works, 12 October 2026 to 11 November 2026 (no carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF EALING: Highway improvement works, 12 October 2026 to 11 November 2026 (no carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF EALING: Highway improvement works, 12 October 2026 to 11 November 2026 (no carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF EALING: Highway improvement works, 12 October 2026 to 15 October 2026 (some carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 4 November 2026 to 5 November 2026 (no carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 2 November 2026 to 3 November 2026 (no carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 28 October 2026 to 29 October 2026 (no carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 20 October 2026 to 21 October 2026 (no carriageway incursion)
- Roadworks Street works permit: BT: New service connection, 3 November 2026 to 5 November 2026 (no carriageway incursion)
- Roadworks Street works permit: BT: New service connection, 22 October 2026 to 23 October 2026 (no carriageway incursion)
- Energy certificates New energy certificate: band C, flat (lodged 18 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.