What has changed: Chapel Road, East Suffolk
New sales and energy certificates on Chapel Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for NR34 7LU changed: 0 addresses at high risk, 0 medium, 2 low (was 0, 0, 3)
- Flood risk Flood risk figures for NR34 7LR changed: 1 address at high risk, 0 medium, 6 low (was 1, 0, 4)
- Roadworks Street works permit: UK POWER NETWORKS EASTERN & LONDON: Utility repair and maintenance works, 9 October 2026 to 16 October 2026 (no carriageway incursion)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.