What has changed: Craig Road, Stockport
New sales and energy certificates on Craig Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- School inspections Priestnall School (secondary, SK4 3HP): new Ofsted outcome, Report card; previously Requires improvement (inspected 22 September 2026)
- School inspections Meadowbank Primary School (primary, SK8 2LE): new Ofsted outcome, Report card (inspected 21 July 2026)
- Flood risk Flood risk figures for SK4 2BW changed: 2 addresses at high risk, 31 medium, 18 low (was 2, 32, 17)
- Flood risk Flood risk figures for SK4 2BS changed: 4 addresses at high risk, 3 medium, 6 low (was 3, 2, 8)
- Flood risk Flood risk figures for SK4 2BN changed: 2 addresses at high risk, 21 medium, 13 low (was 3, 19, 15)
- Flood risk Flood risk figures for SK4 2BH changed: 3 addresses at high risk, 0 medium, 4 low (was 2, 0, 4)
- Flood risk Flood risk figures for SK4 2BE changed: 0 addresses at high risk, 0 medium, 1 low (was 0, 1, 0)
- Flood risk Flood risk figures for SK4 2BA changed: 1 address at high risk, 3 medium, 2 low (was 2, 2, 2)
- Flood risk Flood risk figures for SK4 2AP changed: 0 addresses at high risk, 1 medium, 10 low (was 0, 2, 10)
- Flood risk Flood risk figures for SK4 2AJ changed: 1 address at high risk, 2 medium, 4 low (was 0, 2, 5)
- Roadworks Street works permit: STOCKPORT METROPOLITAN BOROUGH COUNCIL: Highway improvement works, 16 November 2026 (some carriageway incursion)
- Roadworks Street works permit: STOCKPORT METROPOLITAN BOROUGH COUNCIL: Highway improvement works, 10 November 2026 (give and take)
- Roadworks Street works permit: SP Electricity North West: New service connection, 21 January 2027 to 27 January 2027 (road closure)
- Roadworks Street works permit: SP Electricity North West: Remedial works, 15 October 2026 to 19 October 2026 (some carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 19 October 2026 to 20 October 2026 (some carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 23 October 2026 to 26 October 2026 (some carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 7 October 2026 to 9 October 2026 (some carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 7 October 2026 to 9 October 2026 (some carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 30 October 2026 to 3 November 2026 (some carriageway incursion)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.