What has changed: Cray Avenue, Orpington, Bromley
New sales and energy certificates on Cray Avenue, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for BR6 0JB changed: 2 addresses at high risk, 3 medium, 11 low (was 2, 0, 13)
- Flood risk Flood risk figures for BR5 4AL changed: 0 addresses at high risk, 1 medium, 3 low (was 0, 0, 4)
- Flood risk Flood risk figures for BR5 4AA changed: 25 addresses at high risk, 4 medium, 9 low (was 24, 4, 9)
- Flood risk Flood risk figures for BR5 3RN changed: 0 addresses at high risk, 0 medium, 0 low (was 0, 0, 1)
- Flood risk Flood risk figures for BR5 2LG changed: 0 addresses at high risk, 0 medium, 1 low (was 0, 0, 2)
- Flood risk Flood risk figures for BR5 2BJ changed: 0 addresses at high risk, 0 medium, 5 low (was 0, 0, 4)
- Roadworks Street works permit: LONDON BOROUGH OF BROMLEY: Highway repair and maintenance works, 1 October 2026 to 5 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF BROMLEY: Highway repair and maintenance works, 1 October 2026 to 5 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF BROMLEY: Highway repair and maintenance works, 30 October 2026 to 3 November 2026 (no carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 1 October 2026 to 5 October 2026 (no carriageway incursion)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.