What has changed: Elmstead Lane, London, Bromley
New sales and energy certificates on Elmstead Lane, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- School inspections St George's, Bickley, Church of England Primary School (primary, BR1 2RL): new Ofsted outcome, Report card; previously Outstanding (inspected 9 September 2026)
- Flood risk Flood risk figures for BR7 5EW changed: 0 addresses at high risk, 3 medium, 2 low (was 0, 1, 4)
- Flood risk Flood risk figures for BR7 5ER changed: 2 addresses at high risk, 1 medium, 1 low (was 2, 0, 2)
- Flood risk Flood risk figures for BR7 5EQ changed: 1 address at high risk, 0 medium, 4 low (was 1, 0, 5)
- Flood risk Flood risk figures for BR7 5EL changed: 0 addresses at high risk, 0 medium, 2 low (was 0, 0, 3)
- Roadworks Street works permit: LONDON BOROUGH OF BROMLEY: Highway repair and maintenance works, 12 October 2026 to 14 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF BROMLEY: Highway repair and maintenance works, 31 October 2026 to 4 November 2026 (some carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 16 October 2026 to 20 October 2026 (some carriageway incursion)
- Energy certificates New energy certificate: band C, flat (lodged 27 October 2026)
- Energy certificates New energy certificate: band C, flat (lodged 23 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.