What has changed: Farnham Croft, Leeds
New sales and energy certificates on Farnham Croft, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- School inspections White Laith Primary School (primary, LS14 2BL): new Ofsted outcome, Report card (inspected 15 September 2026)
- School inspections Grange Farm Primary School (primary, LS14 1AX): new Ofsted outcome, Report card (inspected 30 June 2026)
- Flood risk Flood risk figures for LS14 2HR changed: 2 addresses at high risk, 1 medium, 5 low (was 2, 1, 4)
- Roadworks Street works permit: NORTHERN POWERGRID (YORKSHIRE) PLC: Utility asset works, 3 May 2027 to 19 May 2027 (some carriageway incursion)
- Roadworks Street works permit: NORTHERN POWERGRID (YORKSHIRE) PLC: Utility asset works, 3 May 2027 to 19 May 2027 (some carriageway incursion)
- Roadworks Street works permit: NORTHERN POWERGRID (YORKSHIRE) PLC: Utility asset works, 19 April 2027 to 7 May 2027 (some carriageway incursion)
- Roadworks Street works permit: NORTHERN POWERGRID (YORKSHIRE) PLC: Utility asset works, 19 April 2027 to 7 May 2027 (some carriageway incursion)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.