What has changed: Field Lane, London, Hounslow
New sales and energy certificates on Field Lane, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Roadworks Street works permit: CADENT GAS LIMITED: Utility asset works, 2 November 2026 to 29 November 2026 (some carriageway incursion)
- Roadworks Street works permit: CADENT GAS LIMITED: Utility asset works, 1 February 2027 to 26 February 2027 (some carriageway incursion)
- Roadworks Street works permit: CADENT GAS LIMITED: Utility repair and maintenance works, 6 October 2026 to 15 October 2026 (road closure)
- Roadworks Street works permit: CADENT GAS LIMITED: Utility asset works, 6 October 2026 to 2 November 2026 (some carriageway incursion)
- Roadworks Street works permit: CADENT GAS LIMITED: Utility asset works, 26 October 2026 to 7 December 2026 (some carriageway incursion)
- Energy certificates New energy certificate: band B, house, end-terrace (lodged 26 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.