What has changed: Goodhart Way, Beckenham, Bromley
New sales and energy certificates on Goodhart Way, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for BR4 0HA changed: 1 address at high risk, 0 medium, 3 low (was 1, 0, 2)
- Flood risk Flood risk figures for BR4 0EY changed: 0 addresses at high risk, 3 medium, 2 low (was 0, 3, 3)
- Flood risk Flood risk figures for BR4 0EX changed: 0 addresses at high risk, 1 medium, 4 low (was 0, 1, 5)
- Flood risk Flood risk figures for BR4 0EU changed: 0 addresses at high risk, 2 medium, 11 low (was 0, 1, 11)
- Flood risk Flood risk figures for BR4 0ET changed: 2 addresses at high risk, 2 medium, 2 low (was 2, 0, 5)
- Flood risk Flood risk figures for BR4 0ES changed: 2 addresses at high risk, 5 medium, 9 low (was 3, 4, 9)
- Flood risk Flood risk figures for BR4 0ER changed: 5 addresses at high risk, 2 medium, 6 low (was 6, 2, 5)
- Roadworks Street works permit: THAMES WATER: Utility asset works, 9 November 2026 to 11 November 2026 (no carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF BROMLEY: Highway repair and maintenance works, 15 August 2026 to 19 August 2026 (some carriageway incursion)
- Roadworks Street works permit: BT: New service connection, 30 October 2026 to 3 November 2026 (no carriageway incursion)
- Roadworks Street works permit: BT: New service connection, 22 October 2026 to 23 October 2026 (some carriageway incursion)
- Energy certificates New energy certificate: band D, house, semi-detached (lodged 24 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.