What has changed: Hatherley Road, Manchester
New sales and energy certificates on Hatherley Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for M20 4XD changed: 0 addresses at high risk, 8 medium, 8 low (was 0, 9, 7)
- Flood risk Flood risk figures for M20 4RU changed: 4 addresses at high risk, 3 medium, 8 low (was 3, 4, 8)
- Flood risk Flood risk figures for M20 4RN changed: 2 addresses at high risk, 8 medium, 18 low (was 2, 9, 17)
- Roadworks Street works permit: SP Electricity North West: New service connection, 11 November 2026 to 27 November 2026 (some carriageway incursion)
- Roadworks Street works permit: SP Electricity North West: New service connection, 23 November 2026 to 11 December 2026 (some carriageway incursion)
- Roadworks Street works permit: SP Electricity North West: New service connection, 2 November 2026 to 13 November 2026 (some carriageway incursion)
- Roadworks Street works permit: United Utilities Water Ltd: Utility repair and maintenance works, 27 October 2026 to 29 October 2026 (some carriageway incursion)
- Roadworks Street works permit: MANCHESTER CITY COUNCIL: Highway improvement works, 27 November 2026 to 22 December 2026 (multi-way signals)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.