What has changed: Havana Close, Manchester
New sales and energy certificates on Havana Close, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Roadworks Street works permit: SP Electricity North West: New service connection, 13 November 2026 to 19 November 2026 (give and take)
- Roadworks Street works permit: United Utilities Water Ltd: Remedial works, 28 October 2026 (give and take)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.