What has changed: High Street, Bildeston, Babergh
New sales and energy certificates on High Street, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for IP7 7TG changed: 0 addresses at high risk, 0 medium, 2 low (was 0, 1, 1)
- Flood risk Flood risk figures for IP7 7EL changed: 0 addresses at high risk, 0 medium, 5 low (was 0, 0, 4)
- Flood risk Flood risk figures for IP7 7EF changed: 2 addresses at high risk, 0 medium, 3 low (was 1, 1, 3)
- Flood risk Flood risk figures for IP7 7DY changed: 0 addresses at high risk, 0 medium, 4 low (was 0, 0, 3)
- Roadworks Street works permit: SUFFOLK COUNTY COUNCIL: Highway repair and maintenance works, 7 December 2026 to 9 December 2026 (road closure)
- Roadworks Street works permit: BT: Utility asset works, 12 January 2027 to 13 January 2027 (road closure)
- Energy certificates New energy certificate: band E, house, end-terrace (lodged 26 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.