What has changed: Highfield Lane, Southampton
New sales and energy certificates on Highfield Lane, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- School inspections Highfield Church of England Primary School (primary, SO17 1PX): new Ofsted outcome, Report card; previously Good (inspected 15 September 2026)
- Food hygiene ratings Meet and Eat (Southampton) Ltd (restaurant/cafe/canteen, SO17 2NF) now 4 Good, was 5 Very good (rated 13 October 2026)
- Food hygiene ratings Burga (restaurant/cafe/canteen, SO17 2NJ) now 4 Good, was 3 Generally satisfactory (rated 13 October 2026)
- Flood risk Flood risk figures for SO17 1RH changed: 0 addresses at high risk, 0 medium, 0 low (was 0, 0, 1)
- Flood risk Flood risk figures for SO17 1PJ changed: 0 addresses at high risk, 0 medium, 3 low (was 0, 0, 2)
- Flood risk Flood risk figures for SO17 1NR changed: 0 addresses at high risk, 0 medium, 0 low (was 0, 0, 2)
- Food hygiene ratings Baboo Ji Vegetarian Kitchen (restaurant/cafe/canteen, SO17 2LD) now Awaiting inspection, was 3 Generally satisfactory
- Food hygiene ratings Fu Kee House (takeaway/sandwich shop, SO17 2NJ) now 5 Very good, was Awaiting inspection (rated 2 July 2026)
- Roadworks Street works permit: SOUTHERN WATER: Utility repair and maintenance works, 30 October 2026 to 3 November 2026 (some carriageway incursion)
- Roadworks Street works permit: SOUTHERN WATER: Utility repair and maintenance works, 1 February 2027 to 5 February 2027 (road closure)
- Roadworks Street works permit: SOUTHERN WATER: Utility repair and maintenance works, 27 October 2026 to 29 October 2026 (some carriageway incursion)
- Roadworks Street works permit: SOUTHAMPTON CITY COUNCIL: Highway improvement works, 12 October 2026 to 17 October 2026 (multi-way signals)
- Roadworks Street works permit: BT: New service connection, 28 October 2026 to 30 October 2026 (some carriageway incursion)
- Roadworks Street works permit: BT: New service connection, 2 November 2026 to 4 November 2026 (some carriageway incursion)
- Roadworks Street works permit: BT: New service connection, 2 November 2026 to 4 November 2026 (some carriageway incursion)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.