What has changed: Hill Brow Road, Liss, East Hampshire
New sales and energy certificates on Hill Brow Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for GU33 7RL changed: 0 addresses at high risk, 0 medium, 0 low (was 0, 0, 3)
- Flood risk Flood risk figures for GU33 7LE changed: 1 address at high risk, 0 medium, 2 low (was 1, 1, 1)
- Flood risk Flood risk figures for GU33 7DT changed: 0 addresses at high risk, 0 medium, 5 low (was 0, 0, 7)
- Roadworks Street works permit: HAMPSHIRE COUNTY COUNCIL: Highway repair and maintenance works, 20 October 2026 (two-way signals)
- Roadworks Street works permit: SOUTH EAST WATER: Utility repair and maintenance works, 6 October 2026 to 8 October 2026 (no carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 16 February 2027 (road closure)
- Roadworks Street works permit: BT: Utility asset works, 16 February 2027 (road closure)
- Roadworks Street works permit: BT: Utility asset works, 18 November 2026 to 20 November 2026 (road closure)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.