What has changed: Kings Hall Road, Beckenham, Bromley
New sales and energy certificates on Kings Hall Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Sales FLAT 1, KNIGHTS COURT, 85, KINGS HALL ROAD sold for £270,000 (flat or maisonette, leasehold) (completed 17 August 2026)
- School inspections Watergate School (not applicable, SE6 3WG): new Ofsted outcome, Report card (inspected 30 June 2026)
- Flood risk Flood risk figures for BR3 1LU changed: 19 addresses at high risk, 2 medium, 1 low (was 18, 1, 3)
- Flood risk Flood risk figures for BR3 1LT changed: 2 addresses at high risk, 6 medium, 6 low (was 7, 1, 3)
- Flood risk Flood risk figures for BR3 1LS changed: 0 addresses at high risk, 0 medium, 13 low (was 0, 0, 9)
- Flood risk Flood risk figures for BR3 1LR changed: 0 addresses at high risk, 1 medium, 24 low (was 0, 1, 2)
- Flood risk Flood risk figures for BR3 1LP changed: 0 addresses at high risk, 0 medium, 1 low (was 0, 0, 0)
- Flood risk Flood risk figures for BR3 1LN changed: 0 addresses at high risk, 1 medium, 9 low (was 0, 1, 8)
- Flood risk Flood risk figures for BR3 1HG changed: 0 addresses at high risk, 0 medium, 0 low (was 0, 0, 2)
- Food hygiene ratings Mount Masala (takeaway/sandwich shop, BR3 4PT) is no longer listed; it was rated 5 Very good
- Roadworks Street works permit: UK POWER NETWORKS EASTERN & LONDON: Disconnection or alteration of supply, 30 November 2026 to 13 December 2026 (two-way signals)
- Roadworks Street works permit: LONDON BOROUGH OF BROMLEY: Highway repair and maintenance works, 14 October 2026 to 16 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF BROMLEY: Highway repair and maintenance works, 19 October 2026 to 21 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF BROMLEY: Highway repair and maintenance works, 14 October 2026 to 16 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF BROMLEY: Highway repair and maintenance works, 14 October 2026 to 16 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF BROMLEY: Highway repair and maintenance works, 14 October 2026 to 16 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF BROMLEY: Highway repair and maintenance works, 14 October 2026 to 16 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF BROMLEY: Highway repair and maintenance works, 14 October 2026 to 16 October 2026 (some carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 23 October 2026 to 27 October 2026 (no carriageway incursion)
- Food hygiene ratings Fennie's Day Nursery (hospitals/childcare/caring premises, BR3 1LS) re-inspected, still 5 Very good (rated 22 October 2026)
- Energy certificates New energy certificate: band D, flat (lodged 19 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.