What has changed: Kingsway, Blackwater, Hart
New sales and energy certificates on Kingsway, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for GU17 0JW changed: 0 addresses at high risk, 0 medium, 4 low (was 0, 0, 2)
- Flood risk Flood risk figures for GU17 0JJ changed: 0 addresses at high risk, 3 medium, 9 low (was 1, 2, 7)
- Flood risk Flood risk figures for GU17 0JD changed: 25 addresses at high risk, 5 medium, 1 low (was 27, 3, 2)
- Flood risk Flood risk figures for GU17 0JB changed: 8 addresses at high risk, 9 medium, 6 low (was 12, 6, 6)
- Flood risk Flood risk figures for GU17 0HZ changed: 0 addresses at high risk, 0 medium, 4 low (was 0, 0, 6)
- Roadworks Street works permit: HAMPSHIRE COUNTY COUNCIL: Highway repair and maintenance works, 20 October 2026 to 22 October 2026 (road closure)
- Roadworks Street works permit: BT: Utility asset works, 12 October 2026 to 14 October 2026 (some carriageway incursion)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.