What has changed: Moscow Drive, Liverpool
New sales and energy certificates on Moscow Drive, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for L13 7DH changed: 3 addresses at high risk, 2 medium, 5 low (was 3, 2, 4)
- Flood risk Flood risk figures for L13 7DE changed: 2 addresses at high risk, 3 medium, 6 low (was 3, 3, 5)
- Flood risk Flood risk figures for L13 7BB changed: 23 addresses at high risk, 16 medium, 2 low (was 24, 14, 3)
- Roadworks Street works permit: United Utilities Water Ltd: Utility repair and maintenance works, 5 November 2026 to 9 November 2026 (give and take)
- Roadworks Street works permit: LIVERPOOL CITY COUNCIL: Highway repair and maintenance works, 29 October 2026 to 30 October 2026 (road closure)
- Energy certificates New energy certificate: band C, flat (lodged 27 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.