What has changed: New Road, West Boldon, South Tyneside
New sales and energy certificates on New Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for NE35 9LR changed: 0 addresses at high risk, 3 medium, 5 low (was 0, 3, 4)
- Flood risk Flood risk figures for NE35 9EE changed: 0 addresses at high risk, 0 medium, 15 low (was 0, 10, 5)
- Flood risk Flood risk figures for NE35 9DT changed: 0 addresses at high risk, 0 medium, 7 low (was 0, 1, 6)
- Flood risk Flood risk figures for NE35 9DR changed: 0 addresses at high risk, 0 medium, 13 low (was 0, 0, 12)
- Roadworks Street works permit: SOUTH TYNESIDE COUNCIL: Highway repair and maintenance works, 21 October 2026 to 30 October 2026 (some carriageway incursion)
- Roadworks Street works permit: NORTHUMBRIAN WATER: Optional permit (no fee) e.g. for traffic management etc, 10 November 2026 (multi-way signals)
- Energy certificates New energy certificate: band D, house, mid-terrace (lodged 15 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.