What has changed: Oxford Road, Tiddington, South Oxfordshire
New sales and energy certificates on Oxford Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for OX9 2LN changed: 0 addresses at high risk, 2 medium, 0 low (was 0, 2, 2)
- Roadworks Street works permit: Open Fibre Networks Limited: Utility asset works, 28 October 2026 to 30 October 2026 (stop/go boards)
- Roadworks Street works permit: THAMES WATER: Utility repair and maintenance works, 4 November 2026 to 6 November 2026 (some carriageway incursion)
- Roadworks Street works permit: THAMES WATER: Utility repair and maintenance works, 25 October 2026 to 8 November 2026 (road closure)
- Roadworks Street works permit: GIGACLEAR LIMITED: Utility asset works, 22 October 2026 to 4 November 2026 (some carriageway incursion)
- Roadworks Street works permit: GIGACLEAR LIMITED: Utility asset works, 22 October 2026 to 4 November 2026 (multi-way signals)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.