What has changed: Parkfield Crescent, London, Harrow
New sales and energy certificates on Parkfield Crescent, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for HA2 6LD changed: 14 addresses at high risk, 6 medium, 13 low (was 14, 5, 14)
- Flood risk Flood risk figures for HA2 6JZ changed: 2 addresses at high risk, 1 medium, 3 low (was 3, 0, 4)
- Flood risk Flood risk figures for HA2 6JY changed: 11 addresses at high risk, 3 medium, 8 low (was 13, 3, 6)
- Roadworks Street works permit: LONDON BOROUGH OF HARROW: Highway repair and maintenance works, 22 October 2026 to 26 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF HARROW: Highway repair and maintenance works, 22 October 2026 to 26 October 2026 (some carriageway incursion)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.