What has changed: Pepper Lane, Shevington Moor, Wigan
New sales and energy certificates on Pepper Lane, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for WN6 0PW changed: 0 addresses at high risk, 0 medium, 3 low (was 0, 0, 2)
- Roadworks Street works permit: Open Fibre Networks Limited: Utility asset works, 4 November 2026 to 6 November 2026 (no carriageway incursion)
- Roadworks Street works permit: Open Fibre Networks Limited: Permanent reinstatement, 17 October 2026 to 18 October 2026 (no carriageway incursion)
- Roadworks Street works permit: WIGAN METROPOLITAN BOROUGH COUNCIL: Highway repair and maintenance works, 21 February 2027 to 21 March 2027 (road closure)
- Roadworks Street works permit: WIGAN METROPOLITAN BOROUGH COUNCIL: Highway repair and maintenance works, 19 October 2026 (stop/go boards)
- Roadworks Street works permit: SP Electricity North West: New service connection, 15 February 2027 to 19 February 2027 (multi-way signals)
- Roadworks Street works permit: United Utilities Water Ltd: Utility repair and maintenance works, 25 October 2026 (some carriageway incursion)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.