What has changed: Perry Street, London, Bexley
New sales and energy certificates on Perry Street, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Roadworks Street works permit: Cellnex OT UK: Utility asset works, 27 October 2026 to 29 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF BEXLEY: Highway improvement works, 7 October 2026 to 12 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF BEXLEY: Highway repair and maintenance works, 7 October 2026 to 12 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF BEXLEY: Section 50, 23 November 2026 to 27 November 2026 (two-way signals)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.