What has changed: Picow Farm Road, Runcorn, Halton
New sales and energy certificates on Picow Farm Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- School inspections Weston Point Primary Academy (primary, WA7 4EQ): new Ofsted outcome, Report card; previously Inadequate (inspected 9 September 2026)
- Flood risk Flood risk figures for WA7 4UA changed: 0 addresses at high risk, 0 medium, 1 low (was 0, 0, 2)
- Roadworks Street works permit: NETWORK RAIL: Works for Rail Purposes, 28 October 2026 to 3 November 2026 (two-way signals)
- Roadworks Street works permit: United Utilities Water Ltd: Utility repair and maintenance works, 2 November 2026 (multi-way signals)
- Roadworks Street works permit: HALTON BOROUGH COUNCIL: Highway repair and maintenance works, 12 October 2026 (some carriageway incursion)
- Roadworks Street works permit: HALTON BOROUGH COUNCIL: Highway repair and maintenance works, 12 October 2026 (some carriageway incursion)
- Roadworks Street works permit: HALTON BOROUGH COUNCIL: Highway repair and maintenance works, 12 October 2026 (some carriageway incursion)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.