What has changed: Redenhall Road, Harleston, South Norfolk
New sales and energy certificates on Redenhall Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for IP20 9QN changed: 4 addresses at high risk, 1 medium, 0 low (was 5, 0, 0)
- Flood risk Flood risk figures for IP20 9HE changed: 18 addresses at high risk, 6 medium, 2 low (was 18, 7, 1)
- Flood risk Flood risk figures for IP20 9HB changed: 3 addresses at high risk, 4 medium, 12 low (was 3, 5, 11)
- Flood risk Flood risk figures for IP20 9ES changed: 5 addresses at high risk, 6 medium, 7 low (was 6, 4, 9)
- Flood risk Flood risk figures for IP20 9ER changed: 4 addresses at high risk, 0 medium, 0 low (was 3, 1, 0)
- Flood risk Flood risk figures for IP20 9EN changed: 6 addresses at high risk, 8 medium, 0 low (was 10, 3, 2)
- Flood risk Flood risk figures for IP20 9AZ changed: 20 addresses at high risk, 1 medium, 18 low (was 20, 5, 14)
- Roadworks Street works permit: CITYFIBRE METRO NETWORKS LTD: Utility asset works, 25 January 2027 to 12 February 2027 (multi-way signals)
- Roadworks Street works permit: CITYFIBRE METRO NETWORKS LTD: Utility asset works, 7 December 2026 to 9 December 2026 (multi-way signals)
- Roadworks Street works permit: NORFOLK COUNTY COUNCIL: Highway repair and maintenance works, 6 November 2026 (give and take)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.