What has changed: Stanford Road, Southfields, Thurrock
New sales and energy certificates on Stanford Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for SS17 7AA changed: 14 addresses at high risk, 1 medium, 0 low (was 15, 0, 0)
- Flood risk Flood risk figures for SS17 0PN changed: 0 addresses at high risk, 0 medium, 0 low (was 0, 1, 0)
- Flood risk Flood risk figures for SS17 0LS changed: 3 addresses at high risk, 2 medium, 4 low (was 4, 2, 4)
- Flood risk Flood risk figures for SS17 0LR changed: 9 addresses at high risk, 2 medium, 4 low (was 11, 1, 3)
- Flood risk Flood risk figures for RM16 3DZ changed: 29 addresses at high risk, 5 medium, 14 low (was 24, 10, 14)
- Flood risk Flood risk figures for RM16 3DW changed: 24 addresses at high risk, 9 medium, 7 low (was 23, 9, 8)
- Flood risk Flood risk figures for RM16 3DH changed: 2 addresses at high risk, 0 medium, 2 low (was 2, 2, 0)
- Flood risk Flood risk figures for RM16 3DG changed: 24 addresses at high risk, 5 medium, 3 low (was 24, 4, 3)
- Flood risk Flood risk figures for RM16 3BX changed: 11 addresses at high risk, 3 medium, 1 low (was 11, 4, 0)
- Flood risk Flood risk figures for RM16 3BT changed: 14 addresses at high risk, 2 medium, 6 low (was 16, 2, 6)
- Flood risk Flood risk figures for RM16 2QL changed: 4 addresses at high risk, 2 medium, 0 low (was 5, 0, 1)
- Flood risk Flood risk figures for RM16 2QH changed: 6 addresses at high risk, 3 medium, 5 low (was 6, 4, 5)
- Flood risk Flood risk figures for RM16 2GT changed: 3 addresses at high risk, 2 medium, 4 low (was 2, 3, 4)
- Flood risk Flood risk figures for RM16 2GE changed: 8 addresses at high risk, 2 medium, 1 low (was 8, 0, 1)
- Roadworks Street works permit: NATIONAL HIGHWAYS: Works for road purposes, 12 October 2026 to 17 October 2026 (two-way signals)
- Roadworks Street works permit: NATIONAL HIGHWAYS: Works for road purposes, 26 November 2026 to 28 November 2026 (lane closure)
- Roadworks Street works permit: NATIONAL HIGHWAYS: Works for road purposes, 26 October 2026 to 31 October 2026 (multi-way signals)
- Roadworks Street works permit: BT: Utility asset works, 2 October 2026 to 6 October 2026 (multi-way signals)
- Roadworks Street works permit: BT: Utility repair and maintenance works, 7 October 2026 to 11 October 2026 (two-way signals)
- Roadworks Street works permit: CADENT GAS LIMITED: Utility repair and maintenance works, 13 October 2026 (no carriageway incursion)
- Roadworks Street works permit: CADENT GAS LIMITED: Utility repair and maintenance works, 15 December 2026 (two-way signals)
- Roadworks Street works permit: CADENT GAS LIMITED: Utility repair and maintenance works, 14 December 2026 (two-way signals)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.