What has changed: Stone Gate, South Holland
New sales and energy certificates on Stone Gate, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for PE12 6RH changed: 0 addresses at high risk, 0 medium, 0 low (was 0, 2, 2)
- Flood risk Flood risk figures for PE12 6HR changed: 0 addresses at high risk, 0 medium, 1 low (was 0, 0, 4)
- Roadworks Street works permit: ANGLIAN WATER: Utility repair and maintenance works, 29 October 2026 to 2 November 2026 (no carriageway incursion)
- Roadworks Street works permit: ANGLIAN WATER: Utility repair and maintenance works, 4 January 2027 to 5 January 2027 (road closure)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.