What has changed: Sydenham Park, London, Lewisham
New sales and energy certificates on Sydenham Park, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Food hygiene ratings The Moustache (restaurant/cafe/canteen, SE26 4BL) now 5 Very good, was 4 Good (rated 21 November 2026)
- School inspections Dulwich Wood Primary School (primary, SE21 8NS): new Ofsted outcome, Report card; previously Good (inspected 15 September 2026)
- Flood risk Flood risk figures for SE26 4EQ changed: 6 addresses at high risk, 17 medium, 15 low (was 13, 12, 12)
- Flood risk Flood risk figures for SE26 4DW changed: 0 addresses at high risk, 0 medium, 0 low (was 0, 0, 1)
- Flood risk Flood risk figures for SE26 4DP changed: 4 addresses at high risk, 0 medium, 4 low (was 8, 0, 0)
- Flood risk Flood risk figures for SE26 4DJ changed: 0 addresses at high risk, 0 medium, 14 low (was 0, 1, 13)
- Roadworks Street works permit: VIRGIN MEDIA: Utility asset works, 6 November 2026 (some carriageway incursion)
- Roadworks Street works permit: THAMES WATER: Utility repair and maintenance works, 1 October 2026 to 5 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF LEWISHAM: Highway repair and maintenance works, 5 October 2026 to 7 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF LEWISHAM: Highway repair and maintenance works, 16 October 2026 to 20 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF LEWISHAM: Highway repair and maintenance works, 2 October 2026 to 6 October 2026 (some carriageway incursion)
- Roadworks Street works permit: BT: New service connection, 19 October 2026 to 20 October 2026 (some carriageway incursion)
- Energy certificates New energy certificate: band D, flat (lodged 20 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.