What has changed: Telegraph Road, Wirral
New sales and energy certificates on Telegraph Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for CH60 7SE changed: 1 address at high risk, 1 medium, 0 low (was 0, 2, 0)
- Flood risk Flood risk figures for CH60 7RN changed: 0 addresses at high risk, 0 medium, 1 low (was 0, 0, 0)
- Flood risk Flood risk figures for CH60 6RN changed: 0 addresses at high risk, 0 medium, 1 low (was 0, 0, 0)
- Flood risk Flood risk figures for CH60 0AJ changed: 0 addresses at high risk, 0 medium, 5 low (was 0, 0, 3)
- Roadworks Street works permit: WIRRAL BOROUGH COUNCIL: Highway improvement works, 9 November 2026 to 31 March 2027 (road closure)
- Roadworks Street works permit: WIRRAL BOROUGH COUNCIL: Highway improvement works, 9 November 2026 to 18 December 2026 (road closure)
- Roadworks Street works permit: WIRRAL BOROUGH COUNCIL: Highway repair and maintenance works, 15 October 2026 to 16 October 2026 (two-way signals)
- Roadworks Street works permit: WIRRAL BOROUGH COUNCIL: Highway improvement works, 9 November 2026 to 31 March 2027 (road closure)
- Roadworks Street works permit: WIRRAL BOROUGH COUNCIL: Highway improvement works, 9 November 2026 to 18 December 2026 (road closure)
- Roadworks Street works permit: WELSH WATER: Utility asset works, 10 November 2026 (multi-way signals)
- Roadworks Street works permit: WELSH WATER: Utility asset works, 11 January 2027 to 15 January 2027 (two-way signals)
- Roadworks Street works permit: WELSH WATER: Utility asset works, 15 November 2026 (multi-way signals)
- Roadworks Street works permit: United Utilities Water Ltd: Utility repair and maintenance works, 12 October 2026 (some carriageway incursion)
- Roadworks Street works permit: MANWEB: Utility repair and maintenance works, 14 October 2026 to 20 October 2026 (no carriageway incursion)
- Roadworks Street works permit: MANWEB: Disconnection or alteration of supply, 10 November 2026 to 18 November 2026 (no carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 12 October 2026 to 14 October 2026 (two-way signals)
- Roadworks Street works permit: CADENT GAS LIMITED: Disconnection or alteration of supply, 1 November 2026 (multi-way signals)
- Roadworks Street works permit: CADENT GAS LIMITED: Disconnection or alteration of supply, 23 October 2026 (multi-way signals)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.