What has changed: The Crescent, Leatherhead, Mole Valley
New sales and energy certificates on The Crescent, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for KT22 8HH changed: 0 addresses at high risk, 0 medium, 2 low (was 0, 0, 0)
- Flood risk Flood risk figures for KT22 8DY changed: 0 addresses at high risk, 1 medium, 0 low (was 0, 0, 1)
- Flood risk Flood risk figures for KT22 8AR changed: 0 addresses at high risk, 0 medium, 2 low (was 0, 0, 0)
- Roadworks Street works permit: SES WATER (Formerly SUTTON & EAST SURREY WATER COMPANY): Utility repair and maintenance works, 14 October 2026 to 20 October 2026 (some carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 6 October 2026 to 8 October 2026 (no carriageway incursion)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.