What has changed: The Ridge, Hastings
New sales and energy certificates on The Ridge, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for TN34 2LN changed: 5 addresses at high risk, 1 medium, 1 low (was 6, 0, 2)
- Flood risk Flood risk figures for TN34 2JW changed: 10 addresses at high risk, 2 medium, 4 low (was 9, 3, 2)
- Flood risk Flood risk figures for TN34 2GT changed: 6 addresses at high risk, 0 medium, 1 low (was 6, 0, 0)
- Flood risk Flood risk figures for TN34 2ER changed: 9 addresses at high risk, 0 medium, 4 low (was 9, 0, 5)
- Flood risk Flood risk figures for TN34 2DP changed: 7 addresses at high risk, 0 medium, 1 low (was 7, 0, 4)
- Roadworks Street works permit: SOUTHERN WATER: Utility repair and maintenance works, 30 October 2026 to 6 November 2026 (give and take)
- Energy certificates New energy certificate: band C, flat (lodged 23 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.