What has changed: Todmorden Road, Summit, Rochdale
New sales and energy certificates on Todmorden Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Roadworks Street works permit: SP Electricity North West: Utility repair and maintenance works, 19 October 2026 to 27 October 2026 (some carriageway incursion)
- Roadworks Street works permit: United Utilities Water Ltd: Utility repair and maintenance works, 29 October 2026 (two-way signals)
- Roadworks Street works permit: BT: Utility repair and maintenance works, 3 November 2026 to 4 November 2026 (multi-way signals)
- Roadworks Street works permit: BT: Utility repair and maintenance works, 27 October 2026 to 29 October 2026 (multi-way signals)
- Roadworks Street works permit: BT: Remedial works, 8 November 2026 (two-way signals)
- Energy certificates New energy certificate: band C, house, mid-terrace (lodged 14 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.