What has changed: Victoria Road, Horley, Reigate and Banstead
New sales and energy certificates on Victoria Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for RH6 7QH changed: 3 addresses at high risk, 15 medium, 20 low (was 3, 17, 18)
- Flood risk Flood risk figures for RH6 7PZ changed: 8 addresses at high risk, 2 medium, 4 low (was 8, 1, 3)
- Flood risk Flood risk figures for RH6 7AF changed: 0 addresses at high risk, 0 medium, 0 low (was 0, 0, 20)
- Roadworks Street works permit: VODAFONE GROUP: Utility asset works, 11 January 2027 to 13 January 2027 (some carriageway incursion)
- Roadworks Street works permit: SURREY COUNTY COUNCIL: Highway improvement works, 13 October 2026 (temp obstruction 15 minute delay)
- Roadworks Street works permit: SURREY COUNTY COUNCIL: Highway improvement works, 15 October 2026 (two-way signals)
- Roadworks Street works permit: SURREY COUNTY COUNCIL: Highway improvement works, 19 October 2026 (stop/go boards)
- Roadworks Street works permit: SURREY COUNTY COUNCIL: Highway improvement works, 7 October 2026 (two-way signals)
- Roadworks Street works permit: SURREY COUNTY COUNCIL: Highway improvement works, 7 October 2026 (two-way signals)
- Roadworks Street works permit: SURREY COUNTY COUNCIL: Highway improvement works, 8 October 2026 (temp obstruction 15 minute delay)
- Roadworks Street works permit: BT: Utility asset works, 22 October 2026 to 23 October 2026 (some carriageway incursion)
- Energy certificates New energy certificate: band C, flat (lodged 22 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.