What has changed: Whitsun Gardens, Bedlington, Northumberland
New sales and energy certificates on Whitsun Gardens, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for NE22 5BE changed: 0 addresses at high risk, 4 medium, 12 low (was 2, 2, 12)
- Flood risk Flood risk figures for NE22 5BD changed: 5 addresses at high risk, 11 medium, 15 low (was 5, 10, 16)
- Roadworks Street works permit: NORTHERN GAS NETWORKS: Utility repair and maintenance works, 19 October 2026 to 12 November 2026 (give and take)
- Roadworks Street works permit: NORTHERN GAS NETWORKS: Utility repair and maintenance works, 19 October 2026 to 12 November 2026 (give and take)
- Energy certificates New energy certificate: band C, flat (lodged 30 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.