What has changed: Wingletye Lane, London, Havering
New sales and energy certificates on Wingletye Lane, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for RM11 3SU changed: 1 address at high risk, 2 medium, 2 low (was 2, 1, 2)
- Flood risk Flood risk figures for RM11 3BU changed: 1 address at high risk, 2 medium, 6 low (was 2, 1, 8)
- Flood risk Flood risk figures for RM11 3AU changed: 1 address at high risk, 1 medium, 4 low (was 1, 1, 5)
- Flood risk Flood risk figures for RM11 3AT changed: 2 addresses at high risk, 5 medium, 10 low (was 2, 6, 11)
- Flood risk Flood risk figures for RM11 3AR changed: 3 addresses at high risk, 5 medium, 16 low (was 3, 7, 13)
- Flood risk Flood risk figures for RM11 2TA changed: 2 addresses at high risk, 2 medium, 8 low (was 3, 1, 10)
- Roadworks Street works permit: EE Ltd: Utility asset works, 18 November 2026 to 21 November 2026 (road closure)
- Roadworks Street works permit: THAMES WATER: Utility repair and maintenance works, 30 October 2026 to 12 November 2026 (priority working)
- Roadworks Street works permit: LONDON BOROUGH OF HAVERING: Highway repair and maintenance works, 26 October 2026 to 28 October 2026 (no carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF HAVERING: Highway repair and maintenance works, 28 October 2026 to 30 October 2026 (no carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF HAVERING: Highway repair and maintenance works, 28 October 2026 to 30 October 2026 (no carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF HAVERING: Highway repair and maintenance works, 3 November 2026 to 5 November 2026 (no carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF HAVERING: Highway repair and maintenance works, 16 October 2026 to 17 October 2026 (some carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF HAVERING: Highway repair and maintenance works, 28 October 2026 to 30 October 2026 (two-way signals)
- Roadworks Street works permit: LONDON BOROUGH OF HAVERING: Highway repair and maintenance works, 28 October 2026 to 30 October 2026 (no carriageway incursion)
- Food hygiene ratings The Palms Hotel (hotel/bed & breakfast/guest house, RM11 3UJ) re-inspected, still 5 Very good (rated 5 October 2026)
- Energy certificates New energy certificate: band D, house, detached (lodged 24 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.