What has changed: Worple Road, Wimbledon, Merton
New sales and energy certificates on Worple Road, changes to the flood risk figures for its postcodes, and new food hygiene ratings and school inspections nearby, newest first, as each monthly or daily update of the source data brings them.
Found in November 2026
- Flood risk Flood risk figures for SW20 8RG changed: 0 addresses at high risk, 2 medium, 12 low (was 0, 2, 11)
- Flood risk Flood risk figures for SW20 8RE changed: 0 addresses at high risk, 0 medium, 0 low (was 0, 3, 0)
- Flood risk Flood risk figures for SW20 8QT changed: 0 addresses at high risk, 0 medium, 3 low (was 0, 0, 6)
- Flood risk Flood risk figures for SW19 7PA changed: 7 addresses at high risk, 1 medium, 4 low (was 7, 1, 3)
- Flood risk Flood risk figures for SW19 4HE changed: 3 addresses at high risk, 0 medium, 1 low (was 3, 1, 0)
- Roadworks Street works permit: SOUTHERN GAS NETWORKS PLC: Disconnection or alteration of supply, 16 November 2026 to 20 November 2026 (multi-way signals)
- Roadworks Street works permit: SOUTHERN GAS NETWORKS PLC: Utility repair and maintenance works, 27 October 2026 to 3 November 2026 (no carriageway incursion)
- Roadworks Street works permit: SOUTHERN GAS NETWORKS PLC: Remedial works, 21 October 2026 to 23 October 2026 (no carriageway incursion)
- Roadworks Street works permit: SOUTHERN GAS NETWORKS PLC: Utility repair and maintenance works, 8 March 2027 to 2 April 2027 (lane closure)
- Roadworks Street works permit: LONDON BOROUGH OF MERTON: Highway repair and maintenance works, 15 October 2026 to 16 October 2026 (priority working)
- Roadworks Street works permit: LONDON BOROUGH OF MERTON: Highway repair and maintenance works, 27 November 2026 to 28 November 2026 (two-way signals)
- Roadworks Street works permit: LONDON BOROUGH OF MERTON: Highway repair and maintenance works, 13 October 2026 (stop/go boards)
- Roadworks Street works permit: LONDON BOROUGH OF MERTON: Highway repair and maintenance works, 2 October 2026 to 21 October 2026 (no carriageway incursion)
- Roadworks Street works permit: LONDON BOROUGH OF MERTON: Highway repair and maintenance works, 13 October 2026 (stop/go boards)
- Roadworks Street works permit: LONDON BOROUGH OF MERTON: Highway repair and maintenance works, 13 October 2026 (some carriageway incursion)
- Roadworks Street works permit: UK POWER NETWORKS EASTERN & LONDON: Utility repair and maintenance works, 14 October 2026 to 16 October 2026 (no carriageway incursion)
- Roadworks Street works permit: UK POWER NETWORKS EASTERN & LONDON: Remedial works, 22 October 2026 to 26 October 2026 (no carriageway incursion)
- Roadworks Street works permit: UK POWER NETWORKS EASTERN & LONDON: Utility repair and maintenance works, 15 October 2026 to 19 October 2026 (no carriageway incursion)
- Roadworks Street works permit: UK POWER NETWORKS EASTERN & LONDON: Utility repair and maintenance works, 21 October 2026 to 23 October 2026 (no carriageway incursion)
- Roadworks Street works permit: UK POWER NETWORKS EASTERN & LONDON: Utility repair and maintenance works, 16 October 2026 to 20 October 2026 (no carriageway incursion)
- Roadworks Street works permit: UK POWER NETWORKS EASTERN & LONDON: Utility repair and maintenance works, 21 October 2026 to 23 October 2026 (no carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 9 October 2026 to 12 October 2026 (some carriageway incursion)
- Roadworks Street works permit: BT: Utility asset works, 4 January 2027 (two-way signals)
- Roadworks Street works permit: ITS TECHNOLOGY GROUP LIMITED: Utility repair and maintenance works, 27 October 2026 to 29 October 2026 (no carriageway incursion)
- Energy certificates New energy certificate: band C, flat (lodged 23 October 2026)
- Energy certificates New energy certificate: band B, house, semi-detached (lodged 14 October 2026)
Hygiene ratings within 500 m (0.3 miles) and school inspections within 2 km (1.2 miles) of the middle of the street. New energy certificates are shown without the address. How each figure is matched is on Methodology.